
The machines behind some of the world’s fastest house factories.
Randek designs and builds the automation that turns a CAD model into finished walls, floors and roof trusses, from a single saw to a complete house factory.
Your local Randek team: Randek Inc. North America
Next event Randek Open House 16–18 Nov · Arvika →
Local expertise, global strength.
Denis leads Randek’s North American operations, bringing 15+ years of experience in industrial automation and aftermarket service.
Sales and Operations Director
denis.zulfic@randek.com
+1 (678) 781-1560 (press 1)
Randek Inc. North America
Start where you are. Grow from there.
One supplier and one data chain from the first saw to a near-unmanned line. Each step builds on the one before, so what you buy today is part of the line you run tomorrow.
-
01Get started
The first machines
Standalone machines for component and panel production. Quick to deliver and built to be extended.
-
02Semi-automatic
Lines the operator runs
The machine takes the heavy, repetitive positioning and nailing. Extended station by station.
-
03Fully automatic
CAD/CAM and robot lines
From CAD file to finished element, with robots sheathing, fastening and insulating.
AutoWallWalls at up to 150 m per hour, with timber or LGS framing.
→
AutoEyeVision-guided truss production, about 9 seconds per plate pairing.
→
AutoFloorFloor, roof and ceiling elements in timber or steel, with robots or a portal.
→
ZeroLaborRobot cells for sheathing, insulation and sub-assembly.
→
See every system by what you build
The questions factory owners ask first
How much automation do I actually need?
It depends on your volume, product mix, available labour, floor space and budget. Many factories start manual or semi-automatic and add automation as the order book grows; nothing bought at the start is wasted. A Randek pre-study recommends the right level before anything is ordered.
Can I automate my existing production line?
Yes. Stations and robot cells can be added one at a time. ZeroLabor cells retrofit onto lines already in production or run independently, and single stations such as the FM1 framing station add a step without a new line.
How much capacity do I need?
It follows from how many homes you build a year, your mix of walls, floors and roofs, and how many shifts you run. The pre-study sets the capacity level from your building system and your demand. For scale: AutoWall produces up to 150 m of wall per hour and AutoFloor up to 90 m² of floor per hour.
Should I automate one process or the complete production flow?
Often one bottleneck first. Randek lines are built to be upgraded, not replaced, so automating the step that holds production back is a common first move, and the next step runs on the same data chain. The automation guide walks through the options.
AutoWall: wall panels at production speed
Up to two board layers with dynamic load balancing on a compact footprint. Start open, grow mixed, and when single-layer speed matters more than complexity, the S3 runs the same data chain.
Robotic sub-assembly, sheathing and insulation cells retrofit onto AutoWall lines already in production.
AutoEye: trusses are mainstream. This is the next step.
Vision-guided plate placement at one pairing roughly every nine seconds, in a market that already builds trusses at volume.
Add an automatic nail bridge, or go further with robotic truss assembly.
The software is the edge
What decides whether a line actually produces is the data chain from CAD model to machine instruction, and back again as measured output.
- Your designCAD / BIM model
- 01 PLAN Randek PlannerPlan elements across lines, with checks before the file reaches the line. →
- 02 VERIFY Randek ViewerEvery element in 3D. Catch errors before production. →
- 03 PRODUCE Machine HMIOne screen per station, showing only what that station needs. →
- 04 IMPROVE MyRandekMachine data you can act on, in real time. →
From BIM model to machine instruction, with no re-drawing in between.
Open by design
We do not ask you to change your design system. If it produces a usable model, we take it from there.
- Works with your existing CAD
- No programming for the customer
- One data chain from plan to measured output
Ask the people who run the lines
Customers in your market, with their names on the quote.

“We have two AutoEye roof truss systems because they build the highest quality trusses in the world, and they do it faster and with less labor than anything else.”
As Canada’s first supplier of components to the housing industry, Riverbend chose a ZeroLabor robotic wall manufacturing system — reaching a higher level of productivity and precision.”
The only supplier who came close to meeting our high requirements was Randek in Sweden. The first two lines paid for themselves in under a year, thanks to reduced production costs. Today, we currently have six lines from Randek.”
They didn’t just provide automation; they co-developed a process that works in a real-world, high-volume factory.”
From pre-study to production start
You are committing a factory, a workforce and a production plan. This is how we take it from idea to running line, together with you.
Pre-study
Products, KPIs, factory constraints, layout and the right level of automation. Before anything is ordered.
Engineer & prove
Built at our own plants in Sweden, then verified through Factory Acceptance Testing before it ships.
Install & empower
Our own installation staff commission the line, train your operators and supervise the production start.
Measure & support
MyRandek tracks the KPIs. A service agreement protects long-term performance.
Single machines ship in a few months. A complete system takes six to eighteen months.
The order is the start of the relationship.
A Randek line is engineered to be upgraded, not replaced. Service, spare parts, modernization and training, from the people who built it.
- Service agreements and remote support
- Spare parts from Sweden and local stock
- Modernization and capacity upgrades of existing lines
- Operator and maintenance training

Talk to Randek Inc. North America
Looking to automate or improve your Offsite production?
Whether you manufacture wall panels, floor or roof cassettes, or roof trusses in timber or LGS, our team in North America is never far away. Connect with Denis Zulfić and his team. Meet online or in person and start a conversation about your production needs, target capacity and goals.
From manual and semi-automated solutions to fully automated production, we’ll help you find the right level of automation for your factory.